Analisis Perbandingan Waktu dan Biaya Pekerjaan Pelat Lantai Menggunakan Metode Konvensional dan Precast Half Slab pada Rumah Sakit X Comparative Analysis of Time and Cost of Floor Slab Work Using Conventional and Precast Half Slab Methods at Hospital X
Main Article Content
Abstract
The selection of the floor slab construction method has become an important issue in multi-storey building projects because it directly affects time and cost efficiency, while studies specifically comparing conventional and precast half slab methods in hospital buildings remain relatively limited. This study aims to analyze the comparison of time and cost in floor slab work using conventional and precast half slab methods in the construction of Hospital X. This study employed a quantitative approach with a case study design. Data were collected through field observation, interviews, and project documentation, and were then analyzed using descriptive comparative analysis. The results showed that the conventional method required a duration of 26 days per floor at a cost of Rp594,552,359, whereas the precast half slab method required a duration of 18 days per floor at a cost of Rp425,251,134. These findings indicate that the precast half slab method was 8 days faster and saved Rp169,301,225 compared with the conventional method. Thus, this study confirms that the precast half slab method is more efficient in terms of time and cost, and provides a practical contribution for contractors and project owners in determining a more effective floor slab work method for hospital buildings and multi-storey buildings.
Downloads
Article Details

Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
References
Arifin, A. S. R., & Jonrinaldi. (2024). Cost estimation analysis of construction projects on simple earthquake-resistant houses. CIVED, 11(1), 13–19. https://doi.org/10.24036/cived.v11i1.485
Arifin, A. S. R., Ashar, F., Rifwan, F., & Sandra, N. (2025). Cost analysis of construction safety management systems: Compliance assessment with Indonesian safety regulations. CIVED, 12(1), 147–158. https://doi.org/10.24036/cived.v12i1.739
Arumsari, P., & Palagian, B. (2024). Comparison of conventional and precast half slab work methods (Case study: Japfa Office Building Daan–Mogot). IOP Conference Series: Earth and Environmental Science, 1324(1), 012012. https://doi.org/10.1088/1755-1315/1324/1/012012
Betan, A., Sofiantin, N., Sanaky, M. J., Primadewi, B. K., Arda, D., Kamaruddin, M. I., & AM, A. M. A. (2023). Kebijakan Kesehatan Nasional. Yayasan Penerbit Muhammad Zaini.
Elungan, A. N. F., & Tjenreng, M. B. Z. (2025). Government policy in health services: Kebijakan pemerintah dalam pelayanan kesehatan. Scientific Journal of Reflection: Economic, Accounting, Management and Business, 8(1), 170–177. https://doi.org/10.37481/sjr.v8i1.1031
Jannah, M., & Kurniati, E. (2025). Analisis Peran Pemerintah Daerah Terhadap Pembangunan Infrastruktur Sebagai Upaya Mendorong Pertumbuhan Ekonomi Di Provinsi Lampung. Jurnal Ilmu Ekonomi, 4(1), 231–251. https://risetekonomi.com/jurnal/index.php/jie/article/view/220
Kustiawan, W., Hasibuan, A. A., Lubis, N., Fayrozi, M. F., & Maisarah, M. (2023). Dampak Positif dan Negatif Pembangunan Infrastruktur Nasional di Era Digital. Equivalent: Jurnal Ilmiah Sosial Teknik, 5(2), 202–207. https://doi.org/10.59261/jequi.v5i2.160
Landuh, N. N. J. M., Sarawati, G. A. G., Suari, N. M. L., Sihombing, A., & Dewi, E. P. S. (2025). Perbandingan Efisiensi Panci Bahan Aluminium dan Besi untuk Memanaskan Air. Algoritma: Jurnal Matematika, Ilmu Pengetahuan Alam, Kebumian dan Angkasa, 3(6), 98–105. https://doi.org/10.62383/algoritma.v3i6.853
Lazuardi, F., & Handri. (2026). Pengaruh Rasio Likuiditas, Solvabilitas, dan Efisiensi Operasi terhadap Profitabilitas Bank yang Terdaftar di Bursa Efek Indonesia Periode 2020–2024. Bandung Conference Series: Business and Management, 6(1), 233–240. https://doi.org/10.29313/bcsbm.v6i1.22836
Lestari, F., Marpaung, G. N., Sainsi, Z. T. A., & Syaifullah, E. (n.d.). Strategi Pembangunan Infrastruktur dan Layanan Publik untuk Meningkatkan Kesejahteraan di Provinsi Lampung [Book chapter].
Manggala, Y., Putra, W. F., Poerwanto, A., Tanita, F., & Derajad, N. (2024). Analisis Kehadiran Rumah Sakit Asing dalam Konteks Layanan Kesehatan Nasional. Proceeding Masyarakat Hukum Kesehatan Indonesia, 1(1), 254–263. https://rumah-jurnal.com/index.php/pmhki/article/view/211
Mitasari, R., Soetjipto, B. E., & Syihabudhin. (2025). Job satisfaction as a mediator of the influence of leader-member exchange and organizational justice on organizational citizenship behavior. Indonesian Interdisciplinary Journal of Sharia Economics (IIJSE), 8(3), 10537–10552. https://doi.org/10.31538/iijse.v8i3.7508
Qian, M., Knill, K., Banno, S., Tang, S., Karanasou, P., Gales, M. J. F., & Nicholls, D. (2024). Speak & improve challenge 2025: Tasks and baseline systems. arXiv. https://arxiv.org/abs/2412.11985
Riyadi, I., Handayani, E., & Dony, W. (2022). Analisa Perbandingan Sistem Pelat Konvensional dengan Sistem Precast Half Slab dalam Segi Waktu dan Biaya. Jurnal Civronlit Unbari, 7(2), 63–69. https://jt.unbari.ac.id/index.php/CIVRONLIT/article/view/100
Romadhoni, M., & Sahid, M. N. (2023). Efektivitas Metode Pekerjaan Pelat Lantai Bondek, Half Precast dan Konvensional Gedung Asrama Putra Al-Azhar. Jurnal Manajemen Teknologi & Teknik Sipil, 6(2), 99–111. https://doi.org/10.30737/jurmateks.v6i2.4949
Wijaksono, O., Tistogondo, J., & Bagio, T. H. (2018). Analisis Perbandingan Efisiensi Waktu dan Biaya Antara Metode Konvensional Slab, Precast Half Slab dan Precast Full Slab pada Proyek Bangunan Hotel Bertingkat di Surabaya. Prosiding Semnastek.
Yanita, R., Mochtar, K., & Huda, N. (2018). Implementasi value engineering (VE) pada desain bangunan tinggi: Metode pelat lantai pracetak half-slab terhadap cast-in-situ. TECHNOPEX-2018 Institut Teknologi Indonesia.