Overburden stripping production at PT Paramitha Persada Tama, a nickel mining company in North Konawe Regency, particularly in Pit Block C and A1B, has not reached the target of 90,000 Bcm/month, as actual production using the existing excavation–loading configuration (Excavator JCB 205, Excavator JCB 305, Excavator Sumitomo 210) and hauling equipment (Hino 500 dump trucks) was only 62,712.4 Bcm/month in September 2021. This study aimed to analyze efforts to achieve the production target by changing the overburden stripping system from sidecast to a hauling system. A comparative approach was used by examining production performance, fuel consumption, and stripping costs between the sidecast system in September 2021 and the hauling system in November 2021. Cost evaluation was conducted by calculating operator salaries and fuel consumption expenditures based on a fuel price of Rp 7,850.00/liter. The analysis showed that under the sidecast system, fuel consumption reached 51,650 liters/month with a fuel ratio of 0.8 and total expenditure of Rp 513,301,500.00, whereas the implementation of the hauling system resulted in an actual production of 97,947.41 Bcm/month with fuel consumption of 47,782 liters/month, yielding a saving of 3,868 liters/month while simultaneously achieving the production target. These findings confirm that the hauling system is more effective and efficient than the sidecast system for overburden stripping at the study site and is feasible to adopt as an operational strategy to optimize production.

Downloads

Download data is not yet available.

Citation Metrics & Similar Scopus Articles

Data source Crossref
0
citations
Citation counts are source-specific and may differ because database coverage, reference matching, and update schedules are different. Counts are not added together. Crossref values represent citation links registered and matched by Crossref.
Check Secondary Documents in Scopus
Open this article in Scopus, then check the Secondary documents tab. Use Manual Citation Fallback only for counts you have verified manually.
Open in Scopus
Similar Scopus Articles
Scopus
  1. Shionoya K. (2027)
    Efficacy of Endoscopic Ultrasound-guided Fine Needle Biopsy With Simplified Macroscopic On-site Evaluation (With Video)
    Den Open, 7(1)
  2. Rajabnia M. (2027)
    Evaluation of Large Language Models in the Clinical Management of Patients With Upper Gastrointestinal Bleeding: Insights From Real-World Patient Data
    Den Open, 7(1)
  3. Kurita Y. (2027)
    Evaluation of Additional Treatment for Residual Cases After Endoscopic Papillectomy of Duodenal Ampullary Tumors
    Den Open, 7(1)

Article Details

How to Cite
Lubis, D., & Anarta, R. (2026). Evaluasi Penambangan Nikel Laterit Menggunakan Sistem Sidecast dalam Pembongkaran Overburden pada Bulan September 2021 di PT Paramitha Persada Tama. TSAQOFAH, 6(2), 2085-2096. https://doi.org/10.58578/tsaqofah.v6i2.8787

References

Cahit, H., Selahattin, K., Necip, G., Tolga, Q., Ibrahim, G., Hasan, S., & Osman, P. (2017). Mineralogy and genesis of the lateritic regolith related Ni-Co deposit of the Çaldağ area (Manisa, western Anatolia), Turkey. Canadian Journal of Earth Sciences.

Hasvah, R., & Maiyudi, R. (2021). Perbandingan Volume Overburden Berdasarkan Data Survey dengan Data Truck Count pada Pit Section 2 Timur PT. Budi Gema Gempita Kabupaten Lahat, Sumatera Selatan. Jurnal Bina Tambang, 6(5), 97–106.

Ikhsan, M., & Yatjong, I. (2024). Rancangan Desain Tambang Nikel Laterit pada Blok D PT. Pernick Sultra Site Waturambaha Kecamatan Lasolo Kepulauan Kabupaten Konawe Utara Provinsi Sulawesi Tenggara. Mining Science and Technology Journal, 3(2), 64–70.

Priadana, M. S., & Sunarsi, D. (2021). Metode Penelitian Kuantitatif. Pascal Books.

Prodjosumarto, P. (1989). Pemindahan Tanah Mekanis. Departemen Tambang, Institut Teknologi Bandung.

Rahman, A. S. (n.d.). Alat Angkut dalam Menangani Penggalian Overburden di PT. Adaro Indonesia. Fakultas Sains dan Teknologi, Universitas Islam Negeri Syarif Hidayatullah.

Rochmanhadi, I. (1992). Kapasitas dan Produksi Alat-Alat Berat. Badan Penerbit Pekerjaan Umum (YBPPU).

Rochmanhadi, I., & Sc, M. (1992). Alat-Alat Berat dan Penggunaannya. Yayasan Badan Penerbit Pekerjaan Umum.

Shaddad, A. R., Widodo, S., & Asmiani, N. (2016). Analisis Keserasian Alat Mekanis (Match Factor) untuk Peningkatan Produktivitas. Jurnal Geomine, 4(3), 111–117.

Sokop, R. M., Arsjad, T. T., & Malingkas, G. (2018). Analisa Perhitungan Produktivitas Alat Berat Gali-Muat (Excavator) dan Alat Angkut (Dump Truck) pada Pekerjaan Pematangan Lahan Perumahan Residence Jordan Sea. Tekno, 16(70).

Syafrizal, K. A., & Guntoro, D. (2011). Karakterisasi Mineralogi Endapan Nikel Laterit di Daerah Tinanggea Kabupaten Konawe Selatan, Sulawesi Tenggara.

Tamba, N. (2021). Kajian Teknis Optimalisasi Alat Gali Muat untuk Pengupasan Lapisan Tanah Penutup Overburden di PT. Adimitra Baratama Nusantara Desa Kampung Jawa dan Desa Muara Kembang, Kec. Sangasanga, Kab. Kutai Kartanegara Kalimantan Timur. Jurnal Sains dan Teknologi ISTP, 15(2), 192–196.