Crane Derrick Maintenance Strategy for Smooth Loading and Unloading on MV. Blossom Pescadores
Main Article Content
Abstract
The smoothness of loading and unloading operations is strongly influenced by the readiness of onboard cargo-handling equipment, particularly crane derrick systems on general cargo vessels. Although previous studies have examined cargo-handling equipment and shipboard maintenance, research specifically addressing crane derrick maintenance strategies using weighted SWOT analysis remains limited. This study aims to analyze the maintenance strategy for crane derrick cargo-handling equipment to support loading and unloading operations on MV. Blossom Pescadores. A qualitative descriptive approach with a case study design was employed. Data were collected through observation, interviews, documentation, and literature study during sea practice on board the vessel. The data were analyzed using SWOT analysis by identifying internal factors, comprising strengths and weaknesses, and external factors, comprising opportunities and threats, which were then formulated into IFAS and EFAS matrices. The findings indicate that crane derrick maintenance on board was still constrained by internal weaknesses, particularly unstructured maintenance schedules, limited operational supervision, and incomplete spare part availability. However, external opportunities remained available through the continued demand for general cargo vessels and knowledge transfer from experienced officers to junior crew members. The SWOT analysis positioned the maintenance strategy in the WO quadrant, indicating that available opportunities should be used to overcome internal weaknesses. This study concludes that structured maintenance schedules, regular wire rope inspection, stronger operational supervision, improved spare part management, and crew competence development are essential to maintain crane derrick readiness. The findings provide practical implications for deck officers and shipping companies in improving the safety, smoothness, and efficiency of loading and unloading operations.

Citation Metrics:
Downloads
Article Details

Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
References
Al Bahari, F., Iskandar, I., Pranyoto, & Erliyani, D. (2025). Optimalisasi Penggunaan Alat Lashing Container Guna Menunjang Keamanan Muatan di MV. Selili Baru. Indonesian Journal of Nautical Study, 2(1), 31–40. https://doi.org/10.46484/ijns.v2i1.605
David, F. R., & David, F. R. (2017). Strategic Management: A Competitive Advantage Approach, Concepts and Cases (16th ed.). Pearson Education.
Dewa, A. L., Karningsih, U. D., & Mulatsih, R. (2021). Analisis Pengaruh Peralatan Bongkar Muat, Waktu Tunggu Truck, Kinerja Operator Bongkar Muat, dan Tenaga Kerja (TKBM) terhadap Produktivitas Bongkar Muat Batubara di Pelabuhan Cirebon: Studi Kasus pada PT. Bira Bumi Persada. Journal of Business, Finance, and Economics (JBFE), 2(2), 89–96. https://doi.org/10.32585/jbfe.v2i2.4591
Gürel, E., & Tat, M. (2017). SWOT analysis: A theoretical review. The Journal of International Social Research, 10(51), 994–1006. https://doi.org/10.17719/jisr.2017.1832
International Organization for Standardization. (2017). Cranes—Wire ropes—Care and maintenance, inspection and discard (ISO Standard No. 4309:2017). https://www.iso.org/standard/66759.html
Jardine, A. K. S., Lin, D., & Banjevic, D. (2006). A review on machinery diagnostics and prognostics implementing condition-based maintenance. Mechanical Systems and Signal Processing, 20(7), 1483–1510. https://doi.org/10.1016/j.ymssp.2005.09.012
Khaldun, A. I., Suryailahi, V. I., & Muajir. (2018). Pelaksanaan Bongkar Muat Peti Kemas dan Waktu Penyelesaian (Turn Round Time). Jurnal Manajemen Bisnis Transportasi dan Logistik, 4(3), 297–302. https://journal.itltrisakti.ac.id/index.php/jmbtl/article/view/824
Maturbongs, D. C., Karubaba, O. C., Permady, G. C., & Sumarta, R. P. (2025). Analisis Penanganan Dokumen dan Hambatan Proses Bongkar Muat di Kapal KM Ciremai pada Pelabuhan Sorong. JPB: Jurnal Patria Bahari, 5(1), 15–22. https://doi.org/10.54017/jpb.v5i1.182
Muchiri, P., Pintelon, L., Gelders, L., & Martin, H. (2011). Development of maintenance function performance measurement framework and indicators. International Journal of Production Economics, 131(1), 295–302. https://doi.org/10.1016/j.ijpe.2010.04.039
Ningrat, A., Tahir, A., Rusnaedi, Reskyani, & Muslihati. (2024). Optimizing container crane performance: Enhancing loading and unloading productivity at PT. Kaltim Kariangau Terminal. Indonesian Journal of Maritime Technology, 2(2), 102–108. https://doi.org/10.35718/ismatech.v2i2.1264
Quatrini, E., Costantino, F., Di Gravio, G., & Patriarca, R. (2020). Condition-based maintenance—An extensive literature review. Machines, 8(2), Article 31. https://doi.org/10.3390/machines8020031
Rangkuti, F. (2016). Analisis SWOT: Teknik Membedah Kasus Bisnis. PT Gramedia Pustaka Utama.
Stazić, L., Komar, I., & Račić, N. (2017). Evaluation methodology for ship’s planned maintenance system database. Transactions on Maritime Science, 6(2), 109–116. https://doi.org/10.7225/toms.v06.n02.002
Sugiarto, E. (2023). Strategi Optimalisasi Perawatan Crane di Atas Kapal FC Winning Sunrise. Nusantara Journal of Multidisciplinary Science, 1(5), 1172–1181. https://jurnal.intekom.id/index.php/njms/article/view/198
Tsang, A. H. C. (2002). Strategic dimensions of maintenance management. Journal of Quality in Maintenance Engineering, 8(1), 7–39. https://doi.org/10.1108/13552510210420577














